An infrastructure becomes landscape design.

Located in the Nortehrn Lagoon Park north of Venice, on the southeastern edge of Sant’Erasmo island, the new water filtration plant is part of the general urban and environmental upgrading of the island that the Magistrato alle Acque di Venezia is implementing through the Consorzio Venezia Nuova, within the context of a programmatic agreement between the Magistrato alle Acque di Venezia, the Veneto Region and the Municipality of Venice.

Venice Lagoon cs pM 1 600x450 Water Filtration Plant in the Venice Lagoon | C+S Associati

Water Filtration Plant in the Venice Lagoon, image courtesy C+S Associati

Venice Lagoon cs pM 2 600x270 Water Filtration Plant in the Venice Lagoon | C+S Associati

Water Filtration Plant in the Venice Lagoon, image courtesy C+S Associati

The fragility of the island, its indefinite shores that change contours and thickness with the tide, the beautiful Austrian battery, trace of the more extensive system of fortifications that once existed in the lagoon, whose thick and solid walls leave a mark on the lagoonal landscape, the regular division of the artichoke cultivations and the ghebi or internal canals design the landscape and the building becomes part of its character.

Venice Lagoon cs pM plan 600x735 Water Filtration Plant in the Venice Lagoon | C+S Associati

Water Filtration Plant in the Venice Lagoon - Conceptual plan, image courtesy C+S Associati

The theme of the project is the design of a ‘threshold space’, the point where the land and its ground comes to an end.

Venice Lagoon cs pM 5 600x447 Water Filtration Plant in the Venice Lagoon | C+S Associati

Water Filtration Plant in the Venice Lagoon, image courtesy C+S Associati

Four one meter thick parallel walls, built in reinforced concrete colored red with pigment constructed as rough, untreated surfaces give the space the building form, like the ruins of an old battery, at the same time defining structure and shape.

The spaces between the concrete structures are closed by full-height panels in Iroko planks that may be opened at the entrance and in the areas used for unloading of dust.

Venice Lagoon cs pM 3 600x799 Water Filtration Plant in the Venice Lagoon | C+S Associati

Water Filtration Plant in the Venice Lagoon, image courtesy C+S Associati

The red concrete walls also serve as basic structures for the design of the landscape. The building buries its roots deep into the ground, at the same time facing the land, the void as a possible façade.

Inaccessible due to regulations, the new water filtration plant was to have occupied a large part of the public land of the island. This has become one of the themes of the project: working on the distribution of the flows used in the depuration, it has been possible to bury a significant part of the construction, that only appears like a form in the land, the only surfacing parts being those necessary for maintenance and the final removal of the residual dusts.

Venice Lagoon cs pM sec ele 600x727 Water Filtration Plant in the Venice Lagoon | C+S Associati

Water Filtration Plant in the Venice Lagoon - Elevations & sections, drawing courtesy C+S Associati

The building consists of two parts: an underground area that contains the depuration part and the space above ground that hosts the area where the mud is dried, an electric cabin and an area for maintenance.

In fact, the underground area with its roof openings contributes to design a new land which becomes a play with paths that intersect one another, forming a pattern with the vegetation. Lavender and phlox, broom, lavender cotton and rosemary follow and reflect the development of the building. They design the accessible part of the park in such a way that the building, which on the contrary is inaccessible, takes on an ampler significance, as an element for ‘land-watching’ that may become an essential part of the system of the Park itself.

+ Project credit / data

Project: Water Filtration Plant in the Venice Lagoon
Place: Isola di Sant Erasmo, Venezia, Italy
Area: 897,11 m²
Type: Industry

Architects and art directors: C+S Associati: Carlo Cappai, Maria Alessandra Segantini   www.cipiuesse.it
Collaborators: Barbara Acciari, Eva Horno Rosas, Alessandro Stefanoni, Carolin Stephanhort, Davide Testi Stefanoni, Andrea  Tenuta, C+S ASSOCIATI
General project: Alberto Scotti con Guido Fiorini, Technital S.p.A.
Stuctures, quantity surveyor and MEP: Alberto Scotti con Guido Fiorini, Technital S.p.A.,
Construction supervision: Diego Semenzato, General Progetti srl
Constructor: CCC  Cantieri Copstruzioni Cemento spa
Direttore tecnico dell’impresa: Manrico Baccarin, CCC spa
General managment: Johann Stocker, Consorzio Venezia Nuova
Design managment: Giorgio Mainoldi, Consorzio Venezia  Nuova
Client: Magistrato alle Acque di Venezia, Regione del Veneto, Comune di Venezia
Actuator: Magistrato alle Acque di Venezia  tramite il Consorzio Venezia Nuova
Chronology: 2005: progetto,  2008: realizzazione
Photos: Pietro Savorelli

Mies van der Rohe Award 2009, Shortlisted project
AR AWARD 2008, Honourable Mention
WA Community Award 2010, Winner

+ All images and drawings courtesy C+S Associati | Photo by Pietro Savorelli

Tags: , , ,

Category: Architecture, Industry

Comments (0)

Trackback URL | Comments RSS Feed

There are no comments yet. Why not be the first to speak your mind.

Comments are closed.